How is
the INSTRUMENT applied to solve environmental problems in the City
?
It still holds that producers of waste water pay so-called “contractual fines” if they do not comply with
the limits. The system will have to re-assessed in the framework of
a trial operation of the refurbished Central Waste Water Treatment
Plant as the fines are often less costly than investments needed to
rectify the situation once the existing capacity of the plant is
used to the full.
nebo odkaz na Waste Response page
|